INTERACTIVE CONCEPT

See a decision take shape.

Explore a fictional project change. Compare the impact, check the source and record a simulated decision.

TRY THE CONCEPT

Two questions. Two examples.

Choose what you want to explore. Both interactive examples use fixed, fictional assumptions.

Fictional demonstration with fixed assumptions. This illustrates the intended workflow; it is not access to the developing FlowGrid application. No AI analysis or live CAD/BIM integration is running. Your inputs stay in this browser and are not saved.

AUSTERAN / PROJECT BRAIN

One change.Many consequences.

Source. Interface. Dependency. Human decision.

A fictional commissioning chain connects scope, quantities, detailed scheduling, budget and human release conditions.

AUSTERAN / PROJECT BRAINOne change. Many consequences.
100%

Source. Interface. Dependency. Human decision.

Drag the canvas. Select a card or connection. Move cards with a mouse; pinch with two fingers to zoom. ⛶ shows the full map.
Test after installationAccepted cable testNetwork readyICT before fit-outSecurity sign-offFit-out ready
SelectedCable test

Awaiting human confirmation

Source & prerequisites

Scope, detailed schedule and budget move together.

A work package connects quantities, productivity, predecessors and costs. Change additional work or capacity: the network, Gantt schedule and cost forecast use the same assumptions.

01

Scope and work

Quantities and requirements determine which activities are needed.

02

Detailed schedule

Productivity, sequence and parallel branches determine duration, float and the completion milestone.

03

Budget and choices

Quantities, capacity and delay determine forecast costs. Compare options before a decision.

Fictional quantity schedule MS-014 / B and schedule baseline PL-014 / B. Quantities and rates below are explicit demo assumptions.

A scenario for human review. A calculated date does not confirm readiness; a forecast neither changes a budget nor authorises orders or payments.

All relations are predefined and traceable in this example. No AI detection or confidence percentage is claimed.

Dependency links

Review gate

Both branches must be ready

0 / 5

Illustrative opening delay

Indirect delay costs

Scope: cable-test acceptance and both readiness conditions remain required. A shorter schedule does not waive them.

Fictional prerequisites

The original parallel chain takes 11 working days; the target is day 13. Quantities and additional capacity change package duration and direct costs; the longest branch determines completion. Delay costs = max(0, completion − 13) × €1,800. Full assumptions and cost breakdown are shown in the linked example above.

Session decision trail

    01 / Source

    A change to the entrance design

    Fictional project: a public building refurbishment. Baseline: €1,200,000 and 200 working days. Design note DN-014, revision B, proposes an accessible entrance layout. A superseded revision A is shown as a review trap. The scenario does not establish compliance with accessibility rules.

    02 / Compare options

    Illustrative project total

    Illustrative duration

    Scope context

    Fixed scenario

    Fixed scenario: total cost = €1,200,000 + selected option cost. Delay = max(0, option duration + review waiting time − 2 days of float). Baseline duration = 200 working days. These are teaching assumptions, not a forecast or cost estimate.

    03 / Human review

    04 / Decision record

    Discuss a similar project question

    Discuss a similar project question ↗