Scope and work
Quantities and requirements determine which activities are needed.
INTERACTIVE CONCEPT
Explore a fictional project change. Compare the impact, check the source and record a simulated decision.
TRY THE CONCEPT
Choose what you want to explore. Both interactive examples use fixed, fictional assumptions.
Change quantities and capacity. Follow the effects on the Gantt schedule, critical path, cost phasing and release gates.
Open the linked example 02What does a design choice mean for cost, timing and review? Compare a fixed scenario.
Open the change exampleFictional demonstration with fixed assumptions. This illustrates the intended workflow; it is not access to the developing FlowGrid application. No AI analysis or live CAD/BIM integration is running. Your inputs stay in this browser and are not saved.
AUSTERAN / PROJECT BRAIN
Source. Interface. Dependency. Human decision.
A fictional commissioning chain connects scope, quantities, detailed scheduling, budget and human release conditions.
Source. Interface. Dependency. Human decision.
Drag the canvas. Select a card or connection. Move cards with a mouse; pinch with two fingers to zoom. ⛶ shows the full map.A work package connects quantities, productivity, predecessors and costs. Change additional work or capacity: the network, Gantt schedule and cost forecast use the same assumptions.
Quantities and requirements determine which activities are needed.
Productivity, sequence and parallel branches determine duration, float and the completion milestone.
Quantities, capacity and delay determine forecast costs. Compare options before a decision.
Fictional quantity schedule MS-014 / B and schedule baseline PL-014 / B. Quantities and rates below are explicit demo assumptions.
Scenario changed: previous demo confirmations are invalidated. Scope, effects and release conditions require renewed review; the budget baseline and required work do not change automatically.
Direct work-package costs
Unchanged budget baseline:Completion milestone
Target milestone: working day 13 ·Forecast final cost of this chain
Variance against budget baseline:Select a work package in the Gantt schedule or network. Both show the same activity. Security and fit-out run in parallel; the longer branch determines opening.
See the selected package in the network ↗Thin bar: baseline without additional work or waiting. Gold bar: scenario on the longest chain. Blue bar: parallel work with float. Day 0 is assumed electrical readiness.
Calculated cost phasing per five working days, not cash flow or a payment schedule. Direct costs are spread evenly across each package's working days; fictional delay costs follow the target milestone. Progress claims, invoices and payments retain separate statuses.
Fictional sub-chain, not a whole-project estimate. Electrical readiness is a starting assumption. Baseline: cable test 2 days / €2,000; ICT 12 points at €400, 4 per day; security 4 tests at €600, 2 per day; fit-out 100 m² at €50, 20 m² per day; opening preparation 1 day / €1,800. The parallel chain takes 11 working days; the target is day 13. Additional waiting occurs before cable testing. Delay beyond day 13 adds fictional indirect costs of €1,800 per working day. An additional crew doubles only the selected package's productivity, for a fixed surcharge. Shared resource limits, calendars, quantity imports and real approval are not modelled. Amounts exclude VAT.
A scenario for human review. A calculated date does not confirm readiness; a forecast neither changes a budget nor authorises orders or payments.
All relations are predefined and traceable in this example. No AI detection or confidence percentage is claimed.
Dependency links
Review gate
Both branches must be ready
Illustrative opening delay
Indirect delay costs
Scope: cable-test acceptance and both readiness conditions remain required. A shorter schedule does not waive them.
The original parallel chain takes 11 working days; the target is day 13. Quantities and additional capacity change package duration and direct costs; the longest branch determines completion. Delay costs = max(0, completion − 13) × €1,800. Full assumptions and cost breakdown are shown in the linked example above.
Session decision trail
01 / Source
Fictional project: a public building refurbishment. Baseline: €1,200,000 and 200 working days. Design note DN-014, revision B, proposes an accessible entrance layout. A superseded revision A is shown as a review trap. The scenario does not establish compliance with accessibility rules.
02 / Compare options
Illustrative project total
Illustrative duration
Scope context
Fixed scenario: total cost = €1,200,000 + selected option cost. Delay = max(0, option duration + review waiting time − 2 days of float). Baseline duration = 200 working days. These are teaching assumptions, not a forecast or cost estimate.
03 / Human review
04 / Decision record